CONSTRUCTION PROGRESS
4th quarter 2018
scheduled
completion date
2019
look
look
look
look
+ 0 PHOTO
look
look
look
+ 5 PHOTOS
look
look
look
+ 8 PHOTOS
look
look
look
+ 10 PHOTOS
look
look
look
+ 1 PHOTO
look
look
look
+ 4 PHOTOS
Marble mounting on a façade work is in completion process. Central lobby fit-out work is in progress, marble laying work on stairs is in progress. Commissioning of internal engineering systems is in progress. Documentation for building commissioning is being prepared.

LOOK
look
look
look
+ 3 PHOTOS
Parking and administrative premises fit-out works were completed. Marble mounting on a façade work is being completed. Central lobby fit-out work is in progress. Commissioning of internal engineering systems is in progress. Documentation for building commissioning is being prepared.

LOOK
2018
look
look
look
+ 2 PHOTOS
Parking and administration premises fit out works have been completed. Marble mounting on a facade work is being completed. Central lobby fit-out work is in progress. Commissioning of internal engineering systems is in progress. Documentation for commissioning is being prepared.

LOOK
look
look
look
+ 6 PHOTOS
The lobby, parking, technical premises, apartments and common areas are being fitted out. Marble mounting on a façade work is almost completed. Landscaping work of the courtyard and adjoining territory is in progress. Elevators have been installed. Work on launching of the heating of the building is in progress. Documentation for commissioning is being prepared.

LOOK
look
look
look
+ 1 PHOTO
The work on cement screed installation and finishing of technical premises was completed. The lobby, parking, technical premises, apartments and common areas are being fitted out. Marble mounting on a façade work is in progress. Landscaping work of the courtyard and adjoining territory is in progress. Work on launching of the heating of the building is in progress. Documentation for commissioning is being prepared.

LOOK
look
look
look
+ 4 PHOTOS
Installation of radiators was completed. Installation work of internal engineering systems was completed. The work on cement screed installation is in progress. The lobby, parking, technical premises, apartments and common areas are being fitted out. Marble mounting on a facade is in progress. Landscaping work of the courtyard is in progress.

LOOK
look
look
look
+ 7 PHOTOS
Roofing works and works on façade heat insulation are completed. Installation of marble on a facade is in process. Works on floor screed laying and installation of engineering systems are in completion process. Floor screed is being completed. Finishing of parking, technical rooms apartments and common areas. Works on landscaping of the inner yard have been started.

LOOK
look
look
look
+ 15 PHOTOS
Installation of windows in apartments has been completed. Roofing and façade heat insulation works are in process. Marble installation on the façade is in process. Installation works on internal engineering systems in process. Works on floor screed laying are in process. Finishing of parking, technical rooms, apartments and public places is in process.

LOOK
look
look
look
+ 2 PHOTOS
Roofing works and heat insulation of the facade are in process, works on façade marble installation are in process.
Works on construction of internal brick walls, installation of internal engineering systems have been carried out. Installation of windows is in process.
Finishing works of underground premises and technical rooms are in process.

LOOK
look
look
look
+ 1 PHOTO
Roofing works and heat insulation of the facade are in process,works on façade marble installation has been started.
Works on construction of internal brick walls, installation of internal engineering systems have been carried out. Installation of windows is in process.
Finishing works of underground premises and technical rooms are in process.

LOOK
look
look
look
+ 3 PHOTOS
Works on construction of internal brick walls, installation of internal engineering systems have been carried out. Facade and roofing works are in the process.
Installation of windows is in process.
Finishing works of underground premises and technical rooms are in process.

LOOK
look
look
look
+ 1 PHOTO
Works on construction of internal brick walls, installation of internal engineering systems have been carried out. Facade and roofing works are in the process. Installation of windows is in process. Finishing of underground premises and technical rooms is carried out.

LOOK
look
look
look
+ 3 PHOTOS
Works on construction of a framework of the building are complete. Works on construction of internal brick walls, installation of engineering systems are in process. Facade and roofing works have been started.

LOOK
look
look
look
+ 3 PHOTOS
In-situ concrete works for the 6th floor walls are in completion stage. Installation of internal brick walls and ventilation systems are in progress.

LOOK
2017
look
look
look
+ 2 PHOTOS
In-situ concrete works for the 4th floor walls are in completion stage. Installation of the floor slab on the 5th floor has begun. Installation of internal brick walls is in progress.

LOOK
look
look
look
+ 0 PHOTO
In-situ concrete works on the 1st and 2nd floors are completed.
In-situ concrete works on the 3d floor are in progress.
A tower crane is in operation.

LOOK
look
look
look
+ 0 PHOTO
Installation of walls on the 1st, 2nd and 3rd floors and floor slabs on the 2nd and 3rd floors is in progress.

LOOK
look
look
look
+ 1 PHOTO
Installation of walls on the 1st, 2nd and 3rd floors and floor slabs on the 2nd and 3rd floors is in progress.

LOOK
look
look
Installation of walls on the 1st, 2nd and 3rd floors and floor slabs on the 2nd and 3rd floors is in progress.

LOOK
look
look
look
+ 2 PHOTOS
Installation of floor slabs and walls on the 2nd floor is in progress.

LOOK
look
look
look
+ 0 PHOTO
Installation of floor slabs and walls on the 1st floor is in progress.

LOOK
look
look
look
+ 3 PHOTOS
Installation of floor slabs and walls on the 1st floor is in progress. Installation and sound insulation of lift shafts is in progress. To ensure the highest quality, the construction process is regularly monitored by four supervision teams representing the designers, the technical inspection, the customer and the general contractor.

LOOK
look
look
look
+ 0 PHOTO
Installation of the capping beam along the diaphragm wall is in progress.
Installation of the in-situ concrete roof for the parking garage is completed.
Installation of the in-situ concrete floor slab between the parking garage and the 1st floor is completed.
Pile head trimming is in progress. Installation of the lift shafts has started.

LOOK
look
look
Installation of the building substructure is carried out by using the advanced top-down technique. Soil grouting is completed two weeks ahead of schedule with 1665 injection piles drilled

LOOK
look
look
Intensive installation of the building substructure. Jet grouting for soil stabilization is 65% completed. Preparation of the top down process has started with pile head trimming.

LOOK
look
look
look
+ 0 PHOTO
Installation of the building substructure is in progress, all approvals and permits have been obtained. 50% percent of the foundation works have been completed. The installation of the diaphragm wall and the pile field, the most important elements of the building substructure have been completed. Soil grouting has started one month ahead of schedule. The building will be completed in the 3rd quarter 2018.

LOOK